Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74314 REL 40: 1992-009-00 EXP WDFW SCR O&M, YAK, UCR, LCR
Project Number:
Title:
Yakima Phase II Fish Screens Operations and Maintenance (O&M) with Washington Department of Fish and Wildlife (WDFW)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
74314 REL 40
Contract Title:
1992-009-00 EXP WDFW SCR O&M, YAK, UCR, LCR
Contract Continuation:
Previous: Next:
74314 REL 10: 1992-009-00 EXP WDFW SCR O&M, YAK, UCR, LCR
Contract Status:
Closed
Contract Description:
Task 1 - Inspection, operation, and maintenance of one fishway and 21 fish screens located on upper and mid-Columbia River tributaries.

Task 2 - Provide ongoing fishway operation and maintenance for 17  lower Columbia River fishways.

Task 3 - Cost-share with other proponents, fish screening Research and Design (effectiveness evaluation of horizontal screen design), fish screen purchase or fabrication, and other allowable actions to support the recovery of anadromous salmonid species in the mid and upper Columbia River and its tributaries.


O&M Area for Screen Site

Yakima & Mid-Col.  
Ahtanum Creek - Shaw/Knox, Lesh
Big Creek - Lund
Rattlesnake Creek - McDaniel’s
Touchet River - East End, Dayton acclimation pond
Tucannon River - Starbuck, Dewitt
Yellowhawk Creek - Falbo, Williams
Wenatchee River - Jones/Shotwell
Entiat River - Knap/Wham

Upper Col. River
Chewuch River - Skyline, Fulton, Chewuch
Twisp River - Twisp Power
Upper Wolf Creek - Upper Wolf Irr. Dist.
Buttermilk Creek - Buttermilk
Early Winters Creek - Early Winters
Beaver Creek - Maracci, Redshirt


O&M Area Fishway Site
Lower Col.
Kalama River - **Little Kalama #2, #3, #4, #5, & #6
Ostrander Creek - South Fork Ostrander
Delameter Creek - Delameter #1 & #2
Cedar Creek - Cedar Cr.
Washougal River - Salmon Falls
Wind River, Shipherd Falls, Wind R. #2
Abernathy Creek - Abernathy
Johnson Creek - #1 & #2, separate construction efforts on the same fishway
Cameron Creek - Cameron Creek fishways #1 & #2

**Little Kalama 2 - Little Kalama site where blasting occurred to promote passage, no infrastructure and only occasional maintenance/inspection.
Account Type(s):
Expense
Contract Start Date:
07/01/2018
Contract End Date:
06/30/2019
Current Contract Value:
$123,597
Expenditures:
$123,597

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Jamie Cleveland Bonneville Power Administration Yes COR jacleveland@bpa.gov (503) 230-3160
Daniel Didricksen Washington Department of Fish and Wildlife (WDFW) Yes Contract Manager daniel.didricksen@dfw.wa.gov (509) 571-5559
Ray Gilmour Washington Department of Fish and Wildlife (WDFW) No Interested Party ray.gilmour@dfw.wa.gov (509) 575-2743
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Janice Jackson Washington Department of Fish and Wildlife (WDFW) No Technical Contact janice.jackson@dfw.wa.gov (360) 902-2444
Thomas Jameson Washington Department of Fish and Wildlife (WDFW) No Supervisor thomas.jameson@dfw.wa.gov (360) 902-2612
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Joshua Rogala Washington Department of Fish and Wildlife (WDFW) Yes Interested Party joshua.rogala@dfw.wa.gov (509) 575-2735
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Amy Windrope Washington Department of Fish and Wildlife (WDFW) No Interested Party amy.windrope@dfw.wa.gov (360) 298-2278
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Documentation and Assistance to Support BPA's Environmental Compliance Group A: 165. Obtain ESA Compliance for O&M Activities 06/30/2019 06/30/2019
Inspect and Maintain Upper and Mid-Columbia R Screens B: 186. Maintain Upper + Mid-Columbia Screens/Fishways (Task #1) 06/30/2019 06/30/2019
O&M Lower Columbia River Tributary Fishway C: 186. Maintain Lower Columbia River Passage (Task #2) 06/30/2019 06/30/2019
Provide Pre-Fabricated Fish Screens and Fish Screening Materials as Appropriate D: 69. Screen Placeholder #1 Provide Materials to Support Install of Fish Screen (Task #3) 06/30/2019 06/30/2019
Provide Pre-Fabricated Fish Screens and Fish Screening Materials as Appropriate E: 69. Screen Placeholder #2 Provide Materials to Support Install of Fish Screen (Task #3) 06/30/2019 06/30/2019
Provide Pre-fabricated Fish Screens and Fish Screening Materials as Appropriate F: 69. Screen Placeholder #3 Provide Materials to Support install of Fish Screen (Task #3) 06/30/2019 06/26/2019
Provide Pre-Fabricated Fish Screens and Fish Screening Materials as Appropriate G: 69. Screen Placeholder #4 Provide Materials to Support Install of Fish Screen (Task #3) 06/30/2019 06/30/2019
Provide Pre-Fabricated Fish Screens and Fish Screening Materials as Appropriate H: 69. Screen Placeholder #5 Provide Materials to Support Install of Fish Screen (Task #3) 06/30/2019 06/30/2019
Effective implementation management and timely contract administration K: 119. Manage and Administer Project 06/30/2019 06/30/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 5 instances of WE 69 Install Fish Screen
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 69 Install Fish Screen

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain ESA Compliance for O&M Activities 07/01/2018
B 186 Maintain Upper + Mid-Columbia Screens/Fishways (Task #1)
C 186 Maintain Lower Columbia River Passage (Task #2)
D 69 Screen Placeholder #1 Provide Materials to Support Install of Fish Screen (Task #3)
E 69 Screen Placeholder #2 Provide Materials to Support Install of Fish Screen (Task #3)
F 69 Screen Placeholder #3 Provide Materials to Support install of Fish Screen (Task #3)
G 69 Screen Placeholder #4 Provide Materials to Support Install of Fish Screen (Task #3)
H 69 Screen Placeholder #5 Provide Materials to Support Install of Fish Screen (Task #3)
I 185 Periodic Status Reports for BPA 07/01/2018
J 132 Support Annual Reporting 07/01/2018
K 119 Manage and Administer Project 07/01/2018